![]() |
![]() |
| It all starts with the arrival of a custom aluminum extrusion. | Prepared to length for machining, pieces are loaded for the first operation. |
![]() |
|
| With a tube mount machined in the first operation, the pieces are loaded for drilling of the tube hole. | The tube hole completes machining of the TUSB bottom. |
|
|
| Cut into individual pieces they are loaded to machine the TUSB top. | The machining of the TUSB now complete the pieces are sent out for anodizing. |
![]() |
![]() |
|
Back from anodizing. |
The Lock Pin, Spring &
Ring is installed and the Pinch Clamp is installed. |